URGENT REQUIREMENTS AT SCHOOL FOR RECONSTRUCTION

 

In order of priority.( subject to change)

Sl.No Description of Item Rough Estimate for each House Total for 8 Houses Remarks
1 Providing Mattresses, 70 Nos. for each house Rs. 70,000/- Rs. 5,60,000/-  
2 Providing Study Tables, 70 Nos Rs. 50,000/- Rs. 4,00,000/- After considering that 50% of material from old tables will be used.
3 Providing Ceiling fans 28 Nos Rs. 28,000/- Rs. 2,24,000/- Including, study hall, recreation etc.
4 Re-doing of Bathrooms with wall and floor tiles, including providing Syntex type (PVC) doors and frames Rs. 1,50,000/- Rs. 12,00,000/-  
5 Providing Aluminum Dining Tables (Industrial type)   Rs. 12,00,000/- With retractable stools attached to the table
6 Providing new Water line from Gosthani to School   Rs. 25,00,000/- Detailed project report will be made soon.
7 Providing New furniture in class rooms   Rs. 4,00,000/- After considering that 50% of material from old tables will be used.
8 Providing new PVC conduit with copper wiring  in lieu of the existing Aluminum open batten wiring in houses and Dining Hall   Rs. 7,00,000/- Rough estimate.
9 Re doing  floor of Dining Hall with Cuddapah Flooring   Rs. 3,00,000/- Rough Estimate
10 Providing Public Address system in all houses and class rooms   Rs. 1,00,000/- Rough Estimate

 

Break up : To enable saikorians to form groups according to Batches or Houses.

Each House-                        Rs. 3,60,000/-

Dining Hall-                          Rs. 16,50,000/-

Instruction Block-                 Rs. 5,00,000/- ( including public address system)

Water lines from Gosthani    Rs. 25,00,000/-